PrajaPrep
Arithmetic

Tap an option below to check the answer and explanation.

Three persons A, B and C can do a piece of work in 18, 36 and 48 days respectively. A, B and C together start working. After 3 days, A leaves the job and B and C continue the job, but due to some reason B also leaves the job after 3 days, whereas C continues till the end of the job. I. A and B together can finish the job in 12 days. II. After the departure of A and B, C alone finishes the job in 26 more days. Which of the following options is correct ?

About this question

Topic:
Arithmetic · Time and work

More questions on this topic

About this practice question

This is a free PrajaPrep practice question for TSPSC Group 4. It belongs to Arithmetic · Time and work. Pick an option above to see whether you are right, then read a short explanation. The page is for students preparing for Telangana and All-India government exams in Telugu, Urdu and English. PrajaPrep is not an official board app, and this question is not a substitute for the official notification or question paper. After you try it, you can sign in free and continue in the app with daily practice, lessons and mocks. Related questions from the same topic are listed here so you can keep practising from this chapter.

Related questions

Answer and explanation

If you want to check after trying the question, the short explanation is here.

I: 1/18 + 1/36 = 1/12, so 12 days, true. II: first 3 days do 3 × 15/144 = 45/144; next 3 days (B and C) do 3 × 7/144 = 21/144. Left = 78/144, and C takes 78/144 × 48 = 26 days, true.