Current affairs · 7 min
Infrastructure news, Oct 2026: metro, roads, Ladakh
Lesson
The Poonamallee–Vadapalani stretch of Chennai Metro Phase II opened on 11 October 2026, at a cost of about ₹4,900 crore. It runs 3.7 km as a double-decker structure, and its signalling is ready for driverless trains.
In Ladakh, the 298 km Nimmu–Padum–Darcha road links Leh to Himachal Pradesh through Zanskar. The Border Roads Organisation, or BRO, built it.
Exam questions on a new project ask its length, builder and location directly, without tricky wording. BRO builds strategic border roads, while NHAI builds national highways elsewhere.
Remember these
The Chennai Metro Phase II double-decker runs 3.7 km.
The Nimmu–Padum–Darcha road is 298 km long and was built by BRO. UDAN was launched on 21 October 2016.
Why the paper asks this
Questions on a new project ask its length, the builder and the location directly, without any trick wording. The detail itself is the answer.
Worked example
A question asks who built the Nimmu–Padum–Darcha road and gives NHAI, BRO, PWD and NHIDCL as options. The road is a BRO project, so BRO is the answer.
Common trap
The ₹4,900 crore figure can be read as the cost of the double-decker alone, but it is the cost of the whole stretch. The double-decker is part of that stretch, which is why the two get confused.
Source: PIB and ministry releases, September–October 2026. Original PrajaPrep summary.
Sign up to continue learning
This lesson is free to read. Sign up free to open the next lesson in the app, keep your progress, and practise questions on this topic.
Sign up to continue learning